Deep exploration
Related plans:
Time: 2024 Year 11 Month 19 Day
Location: Anshun, Guizhou
Testing Equipment: 50M Unshielded Radar
Testing Purpose: The general situation was determined by the electricity method, and the underground karst situation was determined by radar.
Location 1:


Field Data:


Depth 11.6m-17.9m ,Distance 12.87m-17.6m Suspected media stratification exists at a depth of 10.3m ,Distance 24m-33m Suspected large cave exists at a depth of
Location 2:


Field Data:


Total length of measuring line 70m ( 20m-90m ),Preliminary test, general coupling condition


Total length of measuring line 70m ( 20m-90m ),Detailed test, try to couple


Total length of measuring line 35m ( 60m-25m ),Detailed test, try to couple

Conclusion: At a distance of 0m-7m ,at a depth of 2.7m-4.6m 、Distance 12m-22m ,Depth 8m-27m Suspected karst fracture at;Distance 0m-7m ,at a depth of 4.8m 、Distance 12m-22m ,Depth 27.5m Suspected cave at ( 27.5m The cave coincides with the preliminary investigation of the owner unit.)
Related plans






